MidCoast Transit Corridor, San Diego, CA
On this SANDAG project, CL Survey was instrumental in delivering precise surveying that drove track expansion, utility relocations, grading, street improvements, retaining walls, rail construction, and station development. Our expert support kept the project on track through every critical phase.
This transformative project expanded the corridor to accommodate two light rail and two heavy rail tracks while maintaining active rail operations. Running alongside the I-5 freeway from Tecolote Old Town Station to the I-5/805 Interchange, it marks a major milestone in San Diego’s transit evolution.
https://gedo.trimble.com/en/blog/fast-tracking-san-diegos-new-light-rail-system
